Official energy infrastructure projects

The current Union list of projects of common and mutual interest (PCI/PMI): delivery status, mapped components, promoters and what remains unresolved. The completeness flags describe how complete each record is — they are not a measure of strategic importance.

Official projects with status, countries and record completeness
Project Countries Delivery status Commissioning Mapped components Promoter mentions Funding actions
1.1 — Portugal – Spain interconnection between Beariz – Fontefría (ES), Fontefria (ES) –... ES, PT Commissioned 02/07/2026 4 2 0
1.10 — Interconnection between mainland Italy – Corsica (FR) and Sardinia (IT) [currently... FR, IT Under construction 2029 4 2 0
1.11 — Kaunertal Storage Extension Project (AT) AT Permitting 08/2035 1 1 0
1.12 — Purifying-Pumped Hydroelectric Energy Storage NAVALEO (ES) ES Permitting 07/2032 1 1 0
1.13 — Silvermines Pumped Hydroelectric Energy Storage (IE) IE Permitting 31/12/2032 1 1 1
1.14 — Pumped Hydroelectric Energy Storage RIEDL (DE) DE Permitting 02/2032 1 1 0
1.16 — Green Hydrogen Hub Denmark Compressed Air Energy Storage (DK) DK Permitting 2031 1 1 0
1.17 — Pumped Hydroelectric Energy Storage WSK PULS (DE) DE Planned but not yet in permitting 31/12/2034 1 1 0
1.18 — Reversible Hydraulic Pumped Energy Storage AGUAYO II (ES) ES Under construction 31/12/2030 1 1 1
1.19 — Interconnection between Sicily (IT) and Tunisia node (TN) [currently known as “ELMED”] IT, TN Under construction 06/2028 5 2 1
1.2 — Interconnection between Gatica (ES) and Cubnezais (FR) [currently known as “Biscay Gulf”] ES, FR Under construction 31/12/2028 3 2 3
1.20 — Interconnection between Zeebrugge area (BE) and Kemsley, Kent (UK) [currently known as... BE, UK Under consideration 31/12/2032 3 1 0
1.21 — Interconnection between Emden areas (DE) and Corringham, Essex (UK) [currently known... DE, UK Permitting 23/08/2034 3 1 0
1.22 — Internal line between Bordeaux area and Nantes area (FR) [currently known as “GiLA”] FR Under consideration 12/2036 3 1 0
1.23 — Internal line between Montalto and Avenza (IT) [currently known as “HG North... IT Permitting 2034 4 1 0
1.24 — Internal line between Ovelgönne/Rastede/Wiefelstede/Westerstede and Bürstadt and... DE Permitting 31/12/2035 4 1 0
1.25 — Online Grid Controller “PSKW-Rio” (DE) DE Under consideration 12/2030 1 1 0
1.26 — Pumped Hydroelectric Energy Storage CHR IRENE (ES) ES Planned but not yet in permitting 31/12/2035 1 1 0
1.27 — Pumped Hydroelectric Energy Storage PSP CONSO II (ES) ES Permitting 31/12/2034 1 1 0
1.28 — Pumped Hydroelectric Energy Storage Villarosa (IT) IT Permitting 31/12/2032 1 1 0
1.29 — Pumped Hydroelectric Energy Storage Taccu Sa Pruna (IT) IT Permitting 31/12/2033 1 1 0
1.3 — Interconnection between La Martyre (FR) and Great Island or Knockraha (IE) [currently... FR, IE Under construction 30/04/2028 6 2 3
1.30 — Pumped Hydroelectric Energy Storage Favazzina (IT) IT Permitting 31/12/2033 1 1 0
1.31 — Pumped Hydroelectric Energy Storage Serra Del Corvo (IT) IT Permitting 31/12/2032 1 1 0
1.32 — Compressed Air Energy Storage “CAES Ahaus, Germany” (DE) DE Under consideration 2030 1 1 0
1.33 — Interconnection between Woodland (IE) and Turleenan (UK) [currently known as... IE, UK Permitting 10/2031 2 2 0
1.34 — Interconnection between Maynooth (IE) and Bodelwyddan (UK) [currently known as “MaresConnect”] IE, UK Permitting 31/12/2030 3 1 0
1.35 — Interconnection between La Spezia (IT) and Annaba (DZ) and between Suvereto (IT) and... IT, TN Permitting 01/2032 7 3 0
1.4.1 — Internal line from Emden-East to Osterath to increase capacity from Northern Germany... DE Under construction 31/07/2027 1 1 0
1.5 — Internal line in Germany between Brunsbüttel/Wilster to Großgartach/Grafenrheinfeld to... DE Under construction 31/12/2028 1 2 1
1.6 — Internal line between Osterath and Philippsburg (DE) to increase capacity at Western... DE Under construction 31/12/2026 1 2 0
1.7.1 — Interconnection between Navarra (ES) and Landes (FR) [currently known as “Pyrenean crossing 1”] ES, FR Under consideration 2036 3 2 1
1.7.2 — Interconnection between Aragón region (ES) and Marsillon (FR) [currently known as... ES, FR Under consideration 12/2041 3 2 0
1.8 — Interconnection between Lonny (FR) and Gramme (BE) BE, FR Permitting 01/08/2031 1 2 1
1.9 — Internal lines at the Belgian north border between Zandvliet and Lillo-Liefkenshoek... BE Under construction 01/2027 2 1 0
10.1.1 — Internal hydrogen infrastructure in Italy [currently known as “Italian H2 Backbone”] AT, DE, IT, TN Permitting 31/12/2034 4 1 1
10.1.2 — Internal hydrogen infrastructure in Austria [currently known as “H2 Readiness of the... AT, DE, IT, TN Planned but not yet in permitting 31/12/2029 3 1 1
10.1.3 — Internal hydrogen infrastructure in Austria [currently known as “H2 Backbone WAG and... AT, DE, IT, TN Planned but not yet in permitting 2032 7 1 1
10.1.4 — Internal hydrogen infrastructure in Germany [currently known as “HyPipe Bavaria – The... AT, DE, IT, TN Planned but not yet in permitting 31/12/2030 1 1 0
10.10 — EWE Hydrogen Storage Ruedersdorf (DE) DE Planned but not yet in permitting 01/12/2032 1 1 0
10.11 — Fiume Treste Livello Underground Hydrogen Storage (IT) IT Planned but not yet in permitting 2034 1 1 0
10.12 — Offshore hydrogen pipeline between Tunisia and Italy [currently known as “North Africa... IT, TN Planned but not yet in permitting 2034 1 1 0
10.13 — Internal hydrogen infrastructure in Ukraine [currently known as “Central European... UA Under consideration 31/12/2032 1 1 0
10.2.1 — Internal hydrogen infrastructure in Czechia towards Germany [currently known as “Czech... CZ, DE Permitting 31/12/2030 1 1 1
10.2.2 — Internal hydrogen infrastructure in Germany [currently known as “FLOW East – Making... DE Planned but not yet in permitting 31/12/2029 1 1 0
10.2.3 — Internal hydrogen infrastructure in Germany [currently known as “H2ercules Network South-East”] DE Planned but not yet in permitting 31/12/2032 1 2 0
10.3.1 — Internal hydrogen infrastructure in Greece towards the Bulgarian border [currently... BG, GR Planned but not yet in permitting 31/12/2032 1 1 1
10.3.2 — Internal hydrogen infrastructure in Bulgaria towards the Greece border BG, GR Under consideration 31/12/2032 3 1 1
10.5.1 — Internal hydrogen infrastructure in Slovakia [currently known as “Slovak Hydrogen Backbone”] CZ, DE, SK, UA Planned but not yet in permitting 12/2032 5 1 1
10.5.2 — Internal hydrogen infrastructure in Czechia [currently known as “Czech Hydrogen... CZ, DE, SK, UA Planned but not yet in permitting 31/12/2032 1 1 0
10.6.1 — Internal hydrogen infrastructure in Slovakia [currently known as “SK-HU H2 corridor”] HU, SK Planned but not yet in permitting 1 1 0
10.6.2 — Internal hydrogen infrastructure in Hungary [currently known as “HU/SK hydrogen corridor”] HU, SK Planned but not yet in permitting 31/12/2032 1 1 0
10.7.1 — Internal hydrogen infrastructure in Greece [currently known as “Komnina – Florovouni pipeline”] GR, IT Under consideration 01/01/2035 1 1 0
10.7.2 — Offshore hydrogen pipeline between Greece and Italy [currently known as “H2 Poseidon pipeline”] GR, IT Planned but not yet in permitting 2035 2 1 0
10.8 — Ammonia reception facility Ionian Energy Terminal (GR) GR Planned but not yet in permitting 01/2035 1 1 0
10.9 — Electrolyser facility Thalis 1 (GR) GR Planned but not yet in permitting 09/2033 1 1 0
11.1 — Hydrogen interconnector between Sweden and Finland [currently known as “Nordic... FI, SE Planned but not yet in permitting 2032 2 2 1
11.2 — Hydrogen interconnector between Finland, Estonia, Latvia, Lithuania, Poland and... DE, EE, FI, LT, LV, PL Under consideration 31/12/2033 1 6 1
11.3 — Hydrogen interconnector between Finland and Germany [currently known as the “Baltic... DE, FI Planned but not yet in permitting 2032 4 3 1
11.4 — H2 interconnections Germany – Poland [currently known as “Pomeranian Green Hydrogen cluster”] DE, PL Under consideration 31/10/2034 1 2 1
11.5.1 — Porvoo Phase 2 FI Under consideration 2033 1 1 0
11.5.2 — Project FOX FI Planned but not yet in permitting 2032 1 1 0
11.5.3 — Plug Power Kristinestad project FI Planned but not yet in permitting 2030 1 1 0
12.2 — CARMEN (BG, RO), to reinforce cross-border cooperation and data sharing between TSOs,... BG, RO Permitting 31/12/2033 48 4 2
12.3 — Danube InGrid (HU, SK), to efficiently integrate the behaviour and actions of all... HU, SK Under construction 12/2029 35 6 2
12.4 — Gabreta Smart Grids (CZ, DE), to increase grid hosting capacity, enable remote... CZ, DE Under construction 31/12/2032 14 3 1
12.5 — GreenSwitch (AT, HR, SI), to increase hosting capacity for distributed renewable... AT, HR, SI Under construction 31/12/2028 10 7 1
12.6 — Selena (CZ, HU, SK), to enhance energy security, efficiency, and resilience in Czech... CZ, HU, SK Permitting 12/2032 27 6 0
12.7 — Tune (HU, SI, SK), to increase controllability and strengthen the power networks in... HU, SI, SK Planned but not yet in permitting 31/12/2036 7 3 0
13.1 — CO2 TransPorts will establish infrastructure to facilitate large-scale capture,... Under construction 2027 9 1 3
13.10 — Norne – transport infrastructure in Denmark with onshore and possibly offshore... BE, DK, SE, UK Permitting 2030 3 4 1
13.11 — Prinos – Apollo CO2 – Offshore storage at Prinos field for emissions from EL, by... BG, CY, EL, HR, IT, SI Permitting 09/2030 9 2 1
13.12 — Pycasso – transport and storage of CO2 in onshore storage site in southwestern FR,... ES, FR Planned but not yet in permitting 2033 14 3 0
13.13 — Northern Lights – a CO2 cross-border connection project between several European... BE, DE, FR, IE, SE Under construction 04/2032 20 9 5
13.14 — Nautilus CCS – Emissions from Le Havre, Dunkirk, Duisburg and Rogaland areas to be... Permitting 2029 9 15 2
13.15 — BaltiCO2Net – the project includes 17 capture initiatives at industrial emission sites... DE, DK, LV, PL, SE Under consideration 2034 10 8 0
13.16 — ECO2CEE – LCO2 terminal in Gdansk receiving CO2 from industry in Poland via pipeline... PL Under consideration 12/2030 8 5 1
13.17 — Atlas – storage in offshore Atlas site (NO) and transport by CO2 shuttle vessels with... Planned but not yet in permitting 27/09/2031 6 2 0
13.18 — Carbon Connect – a ~200km cross-border sub-sea trunk pipeline for transport and... BE, UK Planned but not yet in permitting 2032 3 2 0
13.19 — German Carbon Transport Grid – the project intends to build and operate an extensive... DE Planned but not yet in permitting 2037 11 1 0
13.2 — Aramis – cross-border CO2 transport and storage project, intake from emitters in the... Permitting 2030 19 5 4
13.4 — Bifrost – transport and storage project with offshore storage in DK from emitters from... DE, DK, PL Planned but not yet in permitting 2030 20 9 0
13.5 — Callisto – development of multi-modal CO2 hubs in the Mediterranean storing CO2... FR, IT Permitting 2035 34 20 1
13.6 — CCS Baltic Consortium – cross-border CO2 transport via pipeline and rail/truck between... LT, LV Planned but not yet in permitting 2030 4 8 1
13.7 — Delta Rhine Corridor – project to transport CO2 via pipelines from emitters in the... DE, NL Planned but not yet in permitting 2033 3 2 1
13.8 — EU2NSEA – cross-border CO2 network developed between Belgium, Germany and Norway to... BE, DE, DK, FR, LV, NL, PL, SE Planned but not yet in permitting 2032 32 5 3
14.1 — GREENCONNECT (Grid for Renewable gas Enabling Efficient Networks and Cross-border... Under consideration 2031 1 2 0
14.2 — Croatia and Slovenia Smart Gas Grid Project HR, SI Planned but not yet in permitting 2034 1 2 0
14.3 — SmartSwitch project – Smartening of existing Greek and Bulgarian Gas Transmission... Under consideration 31/12/2029 1 2 0
15.1 — Connection of Malta to the European gas network – pipeline interconnection with Italy at Gela IT, MT Permitting 09/2031 1 1 2
15.2 — Pipeline from the East Mediterranean gas reserves to Greece mainland via Cyprus and... CY, GR Permitting 01/2030 3 1 2
2.1.1 — Interconnection between Isar/Altheim/Ottenhofen (DE) – St.Peter (AT) AT, DE Permitting 12/2030 3 2 1
2.1.3 — Internal line between Westtirol – Zell/Ziller (AT) AT, DE Planned but not yet in permitting 12/2031 1 1 1
2.1.4 — Interconnector between Pleinting (DE) – St.Peter (AT) AT, DE Permitting 12/2030 5 2 0
2.10 — Ptolemaida Battery Energy Storage System (EL) EL Permitting 01/2028 1 1 0
2.11 — Modernisation of Pumped Hydroelectric Energy Storage in Čierny Váh (SK) [currently... SE, SK Permitting 31/03/2031 1 1 2
2.12 — Interconnector between Subotica (RS) and Sándorfalva (HU) [currently known as... HU, RS Planned but not yet in permitting 2030 3 2 0
2.13 — Interconnection between Sidi Barrani shore (EG) and Mesogeia/St Stefanos (EL)... EG, EL Under consideration 06/2031 12 1 1
2.14 — Internal line between Villanova and Fano (IT) [currently known as “Adriatic HVDC link”] IT Under construction 11/2029 3 1 0
2.15 — Internal line between Lienz, Malta and Obersielach (AT) AT, MT Planned but not yet in permitting 12/2034 1 1 0
2.16 — Interconnection between Hradec (CZ) and Röhrsdorf (DE) CZ, DE Permitting 09/2028 1 1 0
2.17 — Interconnection between Galatina (IT) and Thesprotia (EL) [currently known as “GRITA 2”] EL, IT Planned but not yet in permitting 2033 3 2 0
2.18 — Internal line between St. Peter and Dürnrohr (AT) AT Under consideration 12/2039 1 1 0
2.19 — Internal line between Foggia and Forli (IT) [currently known as “HG Adriatic Corridor”] IT Planned but not yet in permitting 2034 3 1 0
2.2 — Internal line in Germany between Wolmirstedt and Isar [currently known as “SuedOstLink”] DE Under construction 31/12/2027 1 2 1
2.20 — Interconnection between Sajóivánka (HU) – Rimavská Sobota (SK) (No 3.17 on the fourth PCI list) HU, SK Planned but not yet in permitting 12/2030 3 2 0
2.21 — Hydro-pumped storage in Yadenitsa (BG) (No 3.23 on the fourth PCI list) BG Permitting 12/2032 1 1 1
2.22 — Hydro-pumped storage in Kozjak (SI) SI Planned but not yet in permitting 2033 1 1 0
2.23 — Hydro-pumped storage in Batak (BG) BG Under consideration 12/2034 1 1 0
2.24 — Hydro-pumped storage Dospat (BG) BG Under consideration 12/2032 1 1 0
2.25 — Second interconnection between Villanova (IT) and Lastva (ME) IT Permitting 2032 1 2 0
2.26 — Interconnection between Bobov Dol (BG) and Leskovac 2 (RS) [currently known as the... BG, RS Planned but not yet in permitting 2036 6 2 0
2.27 — Interconnection between Anaklia (GE) and Constanta Sud (RO) [currently known as “Black... RO Planned but not yet in permitting 2034 3 2 0
2.28 — Interconnection between Mukacheve (UA) and Veľké Kapušany (SK) SK, UA Permitting 12/2032 1 2 0
2.29 — Interconnection between Artsyz (UA) and Isaccea (RO) RO, UA Planned but not yet in permitting 31/12/2029 1 2 0
2.3.2 — Internal line between Prestice and Kocin CZ Under construction 12/2028 2 1 1
2.3.3 — Internal line between Kocin and Mirovka CZ Permitting 05/2029 2 1 1
2.4 — Interconnector between Würmlach (AT) – Somplago (IT) AT, IT Permitting 12/2029 3 1 1
2.5.1 — Interconnector between Józsa (HU) and Oradea (RO) HU, RO Planned but not yet in permitting 12/2030 1 2 0
2.5.2 — Internal line between Urechesti (RO) and Targu Jiu (RO) HU, RO Planned but not yet in permitting 12/2028 1 2 0
2.5.3 — Internal line between Targu Jiu (RO) and Paroseni (RO) HU, RO Planned but not yet in permitting 12/2028 1 2 0
2.5.4 — Internal line between Paroseni (RO) and Baru Mare (RO) HU, RO Planned but not yet in permitting 12/2028 1 2 0
2.5.5 — Internal line between Baru Mare (RO) and Hasdat (RO) HU, RO Planned but not yet in permitting 12/2028 1 2 0
2.5.6 — Upgrade of substation Rosiori (RO) HU, RO Planned but not yet in permitting 12/2028 1 2 0
2.5.7 — Interconnector between Nadab (RO) and Bekescsaba (HU) HU, RO Planned but not yet in permitting 08/2028 1 2 0
2.6.1 — Interconnection between Hadera (IL) and Kofinou (CY) CY, GR, IL Permitting 12/2032 5 1 2
2.6.2 — Interconnection between Kofinou (CY) and Korakia, Crete (EL) CY, EL, GR, IL Under construction 12/2029 7 1 3
2.7 — Interconnector between Otrokovice (CZ) – Ladce (SK) CZ, SK Under consideration 12/2038 1 2 0
2.8 — Interconnector between Lienz (AT) – Veneto region (IT) AT, IT Planned but not yet in permitting 2036 5 2 0
2.9 — Hydro-pumped storage in Amfilochia (EL) EL Under construction 05/2029 3 1 1
3.10 — Hydro-pumped electricity storage in Finland [currently known as “Kemijoki PSP”] FI Planned but not yet in permitting 01/01/2033 2 1 0
3.2 — Hydro-pumped electricity storage in Estonia EE Permitting 30/09/2035 1 1 1
3.3.11 — Internal line between Dunowo and Żydowo Kierzkowo (PL) PL Under construction 31/12/2027 2 1 1
3.3.12 — Internal line between Piła Krzewina and Żydowo Kierzkowo (PL) PL Under construction 31/12/2027 2 1 1
3.3.13 — Internal line between Morzyczyn-Dunowo-Słupsk-Żarnowiec (PL) PL Under construction 31/12/2027 1 1 1
3.3.14 — Internal line between Żarnowiec-Gdańsk/Gdańsk Przyjaźń-Gdańsk Błonia (PL) PL Commissioned 01/08/2025 1 1 1
3.3.3 — Internal line between Paide and Sindi (EE) EE Under consideration 31/12/2035 2 1 0
3.3.5 — Further infrastructure aspects related to the implementation of the synchronisation of... Under construction 31/12/2029 1 4 7
3.3.6 — Interconnection between Lithuania and Poland [currently known as “Harmony Link”] LT, PL Permitting 31/12/2030 5 2 1
3.5 — Fourth interconnection between Finland – Sweden [currently known as “Aurora line 2”] FI, SE Planned but not yet in permitting 31/12/2036 5 2 0
3.6 — Interconnection between Finland and Estonia [currently known as “Estlink 3”] EE, FI Planned but not yet in permitting 31/12/2038 5 2 0
3.7 — Interconnection between Finland and Sweden [currently known as “Fenno-Skan 3”] FI, SE Under consideration 30/06/2038 3 2 0
3.8 — Interconnection between Sweden and Denmark [currently known as “Upgrade to Konti-Skan”] DK, SE Planned but not yet in permitting 31/03/2036 3 2 0
3.9 — Latvia and Lithuania cross-border strengthening project LT, LV Permitting 12/2034 15 2 0
4.10 — Offshore hybrid interconnector between the United Kingdom and Germany [currently known... DE, UK Planned but not yet in permitting 12/2033 4 1 0
4.2 — Offshore hybrid interconnector between Belgium and Denmark [currently known as “Triton Link”] BE, DK Under consideration 31/12/2038 4 2 0
4.3 — High voltage offshore substation and connection to Menuel (FR) [currently known as... FR Permitting 12/2031 4 1 0
4.4 — High voltage offshore substation and connection to Tourbe (FR) [currently known as... FR Permitting 12/2032 4 1 0
4.5 — Multi-purpose interconnector between Princess Elisabeth Island (BE) and Kent (UK)... BE, UK Planned but not yet in permitting 2035 2 2 1
4.6 — Multi-purpose HVDC interconnection between Great Britain and the Netherlands... NL Permitting 31/12/2032 2 2 0
4.7 — Offshore Wind Connection Fécamp-Grand Large 1 (FR) FR Under consideration 2035 3 1 0
4.8 — Offshore Wind Connection Fécamp-Grand Large 2 (FR) FR Under consideration 2040 3 1 0
4.9 — Offshore hybrid Interconnector between Germany and the Netherlands DE, NL Under consideration 01/2040 1 2 0
5.1 — Latvia and Estonia Hybrid Offshore interconnector [currently known as “Elwind”] EE, LV Planned but not yet in permitting 31/12/2035 9 2 0
5.2 — Bornholm Energy Island (BEI) Hybrid Offshore interconnector between Denmark and Germany DE, DK Permitting 2036 5 2 1
6.1 — Offshore Wind Connection Occitanie (FR) FR Permitting 03/2033 4 1 0
6.2 — Offshore Wind Connection PACA (FR) FR Planned but not yet in permitting 2034 3 1 0
6.3 — Offshore Wind Connection Golfe de Lion Centre (FR) FR Under consideration 2035 3 1 0
8.1 — Offshore Wind Connection South Britanny (FR) FR Permitting 2032 4 1 1
8.2 — Offshore Wind Connection South Atlantic Oléron 1 (FR) FR Planned but not yet in permitting 2035 4 1 0
8.3 — Offshore Wind Connection South Atlantic Oléron 2 (FR) FR Under consideration 2035 2 1 0
8.4 — Offshore Wind Connection Golfe de Gascogne Sud (FR) FR Under consideration 2035 2 1 0
8.5 — Offshore Wind Connection Bretagne Nord-Ouest (FR) FR Under consideration 2035 3 1 0
9.1.1 — Internal hydrogen infrastructure in Portugal DE, ES, FR, PT Permitting 12/2032 2 1 1
9.1.2 — Hydrogen interconnector Portugal – Spain DE, ES, FR, PT Permitting 31/12/2032 3 2 1
9.1.3 — Internal hydrogen infrastructure in Spain DE, ES, FR, PT Permitting 31/12/2029 17 1 1
9.1.4 — Hydrogen interconnector Spain – France [currently known as “BarMar”] DE, ES, FR, PT Permitting 31/12/2032 2 4 1
9.1.5 — Internal hydrogen infrastructure in France connecting to Germany [currently known as “HyFen”] DE, ES, FR, PT Under consideration 2032 2 1 1
9.1.6 — Internal hydrogen infrastructure in Germany connecting to France [currently known as... DE, ES, FR, PT Planned but not yet in permitting 2032 7 2 0
9.10.1 — Ammonia reception facility Antwerp BE Planned but not yet in permitting 31/12/2032 1 2 0
9.10.2 — Ammonia reception facility Amplifhy Antwerp BE Permitting 01/06/2030 1 1 1
9.10.3 — Zeebrugge New Molecules development ammonia reception facility BE Planned but not yet in permitting 31/12/2035 1 1 0
9.10.4 — Ammonia reception facility Antwerp VEPA BE Permitting 31/12/2029 1 1 0
9.11.1 — Ammonia reception facility terminal Brunsbüttel DE Planned but not yet in permitting 2031 1 1 0
9.11.3 — Ammonia reception facility Wilhelmshaven (Uniper) DE Planned but not yet in permitting 2033 1 1 1
9.12.2 — Ammonia reception facility Amplifhy Rotterdam Permitting 01/06/2030 1 1 0
9.13 — Ammonia reception facility Dunkerque (FR) FR Planned but not yet in permitting 2035 1 1 0
9.15.4 — Valle andaluz del hidrógeno verde electrolyser – Huelva ES Permitting 12/2030 1 1 1
9.15.5 — Asturias H2 valley electrolyser ES Permitting 31/12/2032 2 1 1
9.15.6 — Valdo Eume electrolyser ES Permitting 2035 2 2 0
9.15.7 — Catalina electrolyser ES Permitting 11/2030 2 1 0
9.15.8 — ErasmoPower2X electrolyser ES Permitting 2030 2 1 0
9.16.6 — GHYga H2 electrolyser FR Planned but not yet in permitting 2032 1 2 0
9.16.7 — H2V 59 electrolyser FR Permitting 2030 1 1 0
9.17.4 — ScheldeH2 electrolyser (NL) NL Permitting 2032 1 1 0
9.18.3 — Rheinfelden electrolyser DE Permitting 2030 1 1 0
9.18.4 — GreenRoot electrolyser DE Permitting 01/01/2030 2 2 0
9.2.1 — Hydrogen valley in Germany to the French border [currently known as “RHYn”] DE, FR Planned but not yet in permitting 12/2030 2 2 1
9.2.2 — Hydrogen valley in France to the German border [currently known as “Mosahyc”] DE, FR Permitting 2029 4 2 0
9.20 — Danish Hydrogen Storage (DK) DK Planned but not yet in permitting 2033 1 1 0
9.21 — Hystock Opslag H2 storage (NL) NL Permitting 2030 1 1 0
9.22.1 — Salthy hydrogen storage Harsefeld DE Permitting 2033 1 1 1
9.22.10 — RWE H2 Storage Gronau-Epe – 2nd expansion DE Permitting 2031 1 1 0
9.22.11 — UST Hydrogen Storage Epe DE Planned but not yet in permitting 2040 1 1 0
9.22.3 — Salthy hydrogen storage Harsefeld II A+B DE Permitting 2034 1 1 0
9.22.4 — EWE Hydrogen Storage Huntorf DE Permitting 15/12/2029 1 1 0
9.22.5 — UST Hydrogen Storage Krummhörn DE Planned but not yet in permitting 2039 1 1 0
9.22.6 — NWKG H2 Storage DE Permitting 2035 1 1 0
9.22.7 — EWE Hydrogen Storage Jemgum DE Planned but not yet in permitting 30/11/2032 1 1 0
9.22.8 — Gasunie SpHyGER Etzel DE Permitting 2032 1 1 0
9.22.9 — RWE H2 Storage expansion Gronau-Epe (No 9.22.2 on the 1st Union list) DE Permitting 2031 1 1 1
9.24.1 — H2 storage North – 1 ES Permitting 31/12/2029 1 1 1
9.24.2 — H2 storage North – 2 ES Under consideration 31/12/2031 1 1 0
9.26.1 — Hydrogen interconnector France Luxembourg [currently known as “Hy4link (FR)”] BE, FR, LU Planned but not yet in permitting 2032 1 1 0
9.26.2 — Internal hydrogen pipeline in Luxembourg to the Belgium border [currently known as... BE, FR, LU Planned but not yet in permitting 2034 3 3 0
9.27.1 — MidHY FR Planned but not yet in permitting 2032 1 1 0
9.27.2 — HySoW Mediterranean FR Planned but not yet in permitting 12/2032 1 1 0
9.27.3 — HySoW Atlantic FR Planned but not yet in permitting 12/2032 2 1 0
9.28 — Internal hydrogen infrastructure in Germany [currently known as “Hyperlink 4-5”] DE Planned but not yet in permitting 12/2032 1 1 0
9.29.1 — Internal hydrogen infrastructure in Italy from Poggio Renatico to the Swiss border CH, DE, IT Planned but not yet in permitting 12/2034 1 1 0
9.29.2 — Internal hydrogen infrastructure in Germany [currently known as “Alpine HyWay”] CH, DE, IT Planned but not yet in permitting 01/01/2040 1 2 0
9.3 — Internal hydrogen infrastructure in France to the Belgian border [currently known as... FR Under consideration 2034 4 1 0
9.30.1 — HØST PtX Esbjerg (formerly Jyske Banke Nord PtX) electrolyser (No 9.19 on the 1st Union list) DK Permitting 2030 1 1 1
9.30.2 — Hela electrolyser DK Planned but not yet in permitting 01/07/2035 1 1 0
9.30.3 — Vidar electrolyser DK Planned but not yet in permitting 01/07/2031 1 1 0
9.30.4 — Plug Idomlund electrolyser DK Planned but not yet in permitting 01/01/2033 1 1 0
9.30.5 — Esbjerg electrolyser DK Planned but not yet in permitting 01/07/2036 1 1 0
9.31 — H2Austria&Bavaria+Store electrolyser (AT) AT Planned but not yet in permitting 31/12/2029 2 1 0
9.32 — CHYMIA electrolyser (BE) BE Permitting 12/2029 1 1 0
9.33.1 — Storage GeoH2 (No 9.23 on the first Union list) FR Permitting 2032 2 2 0
9.33.2 — HyPSTER_3 Storage FR Planned but not yet in permitting 2033 1 1 0
9.33.3 — HySoW storage FR Planned but not yet in permitting 12/2032 1 1 0
9.34 — Internal hydrogen infrastructure in Switzerland (part of the hydrogen corridor Italy –... CH, DE, IT Planned but not yet in permitting 2035 4 1 0
9.35 — Hydrogen interconnector Belgium – United Kingdom BE, UK Under consideration 01/08/2035 1 2 0
9.4 — Internal hydrogen infrastructure in Germany [currently known as “H2ercules West”] DE Permitting 2028 1 1 0
9.5 — Internal hydrogen infrastructure in Belgium [currently known as “Belgian Hydrogen Backbone”] BE Permitting 31/12/2035 21 1 0
9.6 — Internal hydrogen infrastructure in the Netherlands [currently known as “National... NL Permitting 31/12/2029 1 1 0
9.7.1 — Hydrogen interconnector from the North-South backbone in East to Oude (NL) [currently... DE, NL Planned but not yet in permitting 2032 4 1 0
9.7.2 — Hydrogen interconnector from the North-South backbone in East to Vlieghuis (NL) –... DE, NL Under construction 2027 1 1 0
9.7.3 — Hydrogen interconnector from Netherlands to Germany [currently known as “Delta Rhine... DE, NL Planned but not yet in permitting 2032 1 1 0
9.7.4 — Hydrogen interconnector Germany – Netherlands 2 [currently known as “Hyperlink”] DE, NL Under construction 01/2028 1 1 0
9.7.5 — Hydrogen interconnector from the North-South backbone in Winterswijk/Vreden to Germany... DE, NL Planned but not yet in permitting 2031 1 1 0
9.8 — Offshore hydrogen pipeline Germany [currently known as “AquaDuctus”] DE Permitting 2030 1 1 0
9.9.1 — Internal hydrogen infrastructure in Germany [currently known as “HyperLink III”] DE, DK Planned but not yet in permitting 2030 1 1 0
9.9.2 — Internal hydrogen infrastructure in Denmark [currently known as “DK Hydrogen Pipeline West”] DE, DK Permitting 2030 2 1 0

235 projects shown. Compare specific projects through /api/v1/projects/compare?codes=….